St.Peters Estate  
  Demolition of existing ventilation shafts, caretakers store, Site clearance of existing ball court, walls and lighting. Hard and Soft Landscaping works including Earthworks, new drainage system, retaining walls.  
     
     
  Baldock Town Centre Enhancements  

Among the highlights of the scheme is a new market place, which has been created in the heart of the High Street. This is a multifunctional space with links to other new squares and shared spaces with improved pedestrian links.

 
   
  St.Peters Estate  
  Demolition of existing ventilation shafts, caretakers store, Site clearance of existing ball court, walls and lighting. Hard and Soft Landscaping works including Earthworks, new drainage system, retaining walls.  
     
     
  Baldock Town Centre Enhancements  

Among the highlights of the scheme is a new market place, which has been created in the heart of the High Street. This is a multifunctional space with links to other new squares and shared spaces with improved pedestrian links.

 
   
  Clapham Common Interchange  
  The scheme involves junction reconfiguration to accommodate bus priority measures including re-routing of buses. The works include carriageway widening and kerb realignment.  
  A312 Harlington  
  Junction has been realigned, repaved, replaced of street furniture & guardrails, ducting and drainage works carried out.  
   
  Hackney Highway Maintenance  
  The works comprise of the supply of all materials; labour and plant sufficient to repair, install, relay, resurface, footway and carriageways, including kerbs and paving.  
  Westminster Footway works  
  Full reconstruction of the footways at various locations in Westminster city. Taking up exist paving and dispose. New sub-base material placed at necessary areas. New artificial stone paving slabs are provided and laid on a new sand and cement bed.  
   
  A214 Trinity Road Street Scene  
  Reconstruction of footway areas and tactile paved crossings, Construction of kerbs to the standard height and Construction of three entry treatments. Removing street clutter and replacing guardrails and bollards.  
  Streatham High Road Phase I & II  
  Reconstruction of footway areas using Artificial Stone and Yorkstone paving and tactile paved crossings, Construction of kerbs to the standard height.  
   
  Chertsey Road footway works    
  Removing grass on footway and replaced with block paving. Bollards removed from edges of carriageway and reinstated on paving area. Pedestrian Guard Rails taken up and replaced. Grass area replaced with new topsoil.  
  A205 Stanstead Road Footway works  
  Artificial Stone-wall construction , surface water drainage & soakage system installation, landscaping, Yorkstone footway paving and internal Clearmac footway construction, fencing installation and extensive planting and turfing.  
   
  South Lambeth Road  
  Reconstruction of footway areas and tactile paved crossings, Construction of kerbs to the standard height and Construction of three entry treatments. Removing street clutter and replacing guardrails and bollards.  
     
   
  Kennington Cross  
  High Quality upgrade of an existing trunk road junction including entry treatments and shop frontages with Yorkstone and Granite surfacing.