St.Peters Estate |
|
| |
Demolition of existing ventilation shafts, caretakers store, Site clearance of existing ball court, walls and lighting. Hard and Soft Landscaping works including Earthworks, new drainage system, retaining walls. |
|
| |
|
|
| |
|
|
|
 |
| |
Baldock Town Centre Enhancements |
|
|
Among the highlights of the scheme is a new market place, which has been created in the heart of the High Street. This is a multifunctional space with links to other new squares and shared spaces with improved pedestrian links. |
|
|
| |
 |
|
 |
 |
| |
St.Peters Estate |
|
| |
Demolition of existing ventilation shafts, caretakers store, Site clearance of existing ball court, walls and lighting. Hard and Soft Landscaping works including Earthworks, new drainage system, retaining walls. |
|
| |
|
|
| |
|
|
|
 |
| |
Baldock Town Centre Enhancements |
|
|
Among the highlights of the scheme is a new market place, which has been created in the heart of the High Street. This is a multifunctional space with links to other new squares and shared spaces with improved pedestrian links. |
|
|
| |
 |
|
 |
 |
| |
Clapham Common Interchange |
|
| |
The scheme involves
junction reconfiguration to accommodate bus
priority measures including re-routing of buses.
The works include carriageway widening and kerb
realignment. |
|
|
 |
| |
A312 Harlington |
|
| |
Junction
has been realigned, repaved, replaced of street
furniture & guardrails, ducting and drainage
works carried out. |
|
|
| |
 |
|
 |
 |
| |
Hackney Highway Maintenance |
|
| |
The works comprise
of the supply of all materials; labour and plant
sufficient to repair, install, relay, resurface,
footway and carriageways, including kerbs and
paving. |
|
|
 |
| |
Westminster Footway works |
|
| |
Full reconstruction of
the footways at various locations in Westminster
city. Taking up exist paving and dispose. New
sub-base material placed at necessary areas. New
artificial stone paving slabs are provided and
laid on a new sand and cement bed. |
|
|
| |
 |
|
 |
 |
| |
A214
Trinity Road Street Scene
|
|
| |
Reconstruction of footway areas and
tactile paved crossings, Construction of kerbs to
the standard height and Construction of three
entry treatments. Removing street clutter and
replacing guardrails and bollards. |
|
|
 |
| |
Streatham
High Road Phase I & II |
|
| |
Reconstruction of footway areas using
Artificial Stone and Yorkstone paving and tactile
paved crossings, Construction of kerbs to the
standard height. |
|
|
| |
 |
|
 |
 |
| |
Chertsey Road footway works |
|
| |
Removing
grass on footway and replaced with block paving.
Bollards removed from edges of carriageway and
reinstated on paving area. Pedestrian Guard Rails
taken up and replaced. Grass area replaced with
new topsoil. |
|
|
 |
| |
A205 Stanstead Road Footway works
|
|
| |
Artificial Stone-wall construction ,
surface water drainage & soakage system
installation, landscaping, Yorkstone footway
paving and internal Clearmac footway construction,
fencing installation and extensive planting and
turfing. |
|
|
| |
 |
|
 |
 |
| |
South Lambeth Road |
|
| |
Reconstruction of footway
areas and tactile paved crossings, Construction of
kerbs to the standard height and Construction of
three entry treatments. Removing street clutter
and replacing guardrails and bollards. |
|
| |
|
|
| |
 |
|
|
 |
|
| |
|
|
|